Adore Group

Truth Verdict

An early-stage record — projects on schedule so far, none delivered yet. The balance sheet reads stretched.

01

About the developer

Adore Group is an active Gurugram developer; we hold in-depth reports on 2 of its projects. The read below is our own — delivery and delay history from public RERA filings, financial health from published financials, not the developer's marketing.

02

Track record

Projects we track

Flagship projects

  • Adore The Select Premia
03

Performance

2

Projects launched

0

Delivered

2

Ongoing

On schedule · locked

Avg delay · locked

Across every Gurugram project we track for this developer — delivered, ongoing and lapsed. Not scoped to one micro-market.

Free · no card

How reliably does Adore Group deliver?

Unlock the on-schedule share and the average slippage across this developer's filed projects — with a number.

or

Buyer-side only — no broker calls, no spam. The project reads stay open to you.

04

Financial health

42/100 · WATCHCR: UnratedGroup: Adore RealTech Private Limited

Leverage · locked

Interest Coverage · locked

Cash Conversion · locked

Operating Margin · locked

Inventory Cover · locked

Forensic Analyst Audit Note

A directional read on Adore Group's financial health. The full audited financials and the per-project forensics are inside each report — unlock one for the complete numbers.

Verified Source: Ministry of Corporate Affairs (MCA-21) Form AOC-4 Statutory Financial Filing (CIN: U70100DL2015PTC284917)
📄 View Official Audited Statement (PDF) →
05

News & updates

Live11 verified updates

News & Updates

Every verified ground event on Adore Group — filings, construction, JVs, corridor infrastructure and pricing — read for what it means to a buyer.

19 Oct 2026Regulatory

HERC grants 25-year parallel power distribution licence for Gurugram, Nuh to Eleven Power

  • The Haryana Electricity Regulatory Commission (HERC) has granted Eleven Power Private Limited a parallel distribution licence for Gurugram and Nuh revenue districts for 25 years under Section 14 of the Electricity Act, 2003.
Forensic impact read

HERC granted a 25-year parallel power-distribution licence for Gurugram and Nuh to a private company, alongside the existing state discom. Over time this can give residents a second electricity supplier; tariffs, the coverage area and rollout timing are what to watch. Update (23 Oct): after a strike by power employees, the state government assured them there would be no privatisation (ThePrint), so whether this licence is actually rolled out is now uncertain. Talks resume on 3 Nov.

1 Oct 2026Regulatory

CAQM Winter GRAP Stage III/IV Guidelines Enforced: Complete Ban on C&D Activities, Earthwork & RCC Casting Across NCR

  • Commission for Air Quality Management (CAQM) invokes strict Winter Graded Response Action Plan (GRAP Stage III/IV) measures across Delhi-NCR following severe air quality deterioration (AQI >400).
  • Mandates complete cessation of construction and demolition (C&D) activities, including earthwork, excavation, piling, concrete mixing/casting, and transit of loose building materials across Gurugram.
  • Non-earthwork site operations subject to strict anti-smog gun deployment and water-sprinkling mandates.
Forensic impact read

Immediate site halt freezes ongoing structural casting and superstructure progress; introduces potential 30–60 day milestone slippage risks; elevates idle machinery carrying and labor retention costs for developers across active under-construction developments.

Ref CAQM/DIR/GRAP-2026-10Verify filing ↗
22 Sept 2026Regulatory

Gurugram tightens construction and demolition waste rules; no Occupancy Certificate without disposal proof

  • The Municipal Corporation of Gurugram (MCG) has tightened rules for construction and demolition (C&D) waste management, making proof of proper waste disposal a mandatory requirement for obtaining Occupancy Certificates (OCs) and Completion Certificates (CCs).
Forensic impact read

MCG will not issue an Occupancy Certificate without proof of construction-and-demolition waste disposal — a new compliance gate that can delay OC/possession timelines across Gurugram projects.

11 Sept 2026Regulatory

Gurugram waterlogging: HHRC orders city-wide drainage audit, summons GMDA report by December 15

  • The Haryana Human Rights Commission (HHRC) has taken suo motu cognizance of recurring Gurugram waterlogging, calling it a problem that "goes beyond a temporary disruption caused by heavy rainfall" and ordering a comprehensive city-wide civic infrastructure audit.
24 Jun 2026Corridor Infra

Gurugram’s Southern Peripheral Road Elevated Corridor Project Re-Enters Planning Stage As GMDA Seeks Fresh DPR For Key Stretch

  • Bookmark stories for easy access on any device or the Swarajya app . The Gurugram Metropolitan Development Authority (GMDA) has restarted planning for the long-delayed Southern Peripheral Road (SPR) elevated corridor by inviting bids to prepare a detailed project report (DPR) for the 6 km Ghata Chowk–Vatika Chowk stretch.
swarajyamag.comVerify filing ↗
5 Jun 2026Corridor Infra

GMDA withdraws tender for construction of elevated road on SPR

  • The Gurugram Metropolitan Development Authority (GMDA) on Friday withdrew the ₹ 750 crore tender for constructing an elevated road on the Southern Peripheral Road (SPR) from Vatika Chowk to Clover Leaf on the Delhi-Gurugram Expressway, officials said.
hindustantimes.comVerify filing ↗
21 Apr 2026Corridor Infra

Gurugram: 3.5 Km Service Roads Planned, Sector 68–69 Missing Link To Be Completed To Decongest SPR: Report

  • Bookmark stories for easy access on any device or the Swarajya app . With traffic steadily worsening along Gurugram’s Southern Peripheral Road (SPR), the Gurugram Metropolitan Development Authority (GMDA) has initiated plans to strengthen internal connectivity by developing new service roads and completing long-pending road links.
swarajyamag.comVerify filing ↗
14 Apr 2026Corridor Infra

New Gurugram’s connectivity leap: New Sector 68-69 road to slash traffic on Sohna highway

  • In a major breakthrough for residents of Southern Peripheral Road (SPR) and New Gurugram, work has finally accelerated on a critical 2-km master road dividing Sectors 68 and 69. This project, spearheaded by the Gurugram Metropolitan Development Authority (GMDA), aims to provide direct connectivity to the Gurugram-Sohna Highway near Badshapur, effectively ending a four-year wait for thousands of commuters.
tribuneindia.comVerify filing ↗
15 Mar 2026Corridor Infra

Tender for Rs 755-cr Metro corridor floated by Gurugram authority

  • The Gurugram Metropolitan Development Authority (GMDA) has floated a Rs 755-crore tender for the construction of a signal-free elevated corridor on the Southern Peripheral Road (SPR) between Vatika Chowk and NH-48. Officials said the project will upgrade the 4.2-km stretch of SPR into a signal-free corridor aimed at improving connectivity and easing traffic congestion along one of the city’s key road networks.
tribuneindia.comVerify filing ↗
12 Nov 2025Corridor Infra

Haryana CM clears key Gurugram, Rewari projects; War Memorial at Naseebpur revived

  • Gurugram’s much-criticised traffic bottleneck, the Southern Peripheral Road (SPR), is set for a major overhaul, with the Haryana Government approving its transformation into an elevated corridor at a cost of Rs 1,200 crore. Additionally, a Rs 308-crore full trumpet interchange is planned at AIIMS Rewari, while the long-pending War Memorial at Naseebpur (Mahendragarh) is expected to move to the tendering stage soon.
tribuneindia.comVerify filing ↗
11 Jul 2022Corridor Infra

₹3,449 Crore Sohna Elevated Highway Commissioned; Direct 15-Minute Link for Central Park Flagships

  • 6-lane elevated highway provides signal-free commute from Central Park enclaves directly to Subhash Chowk and NH-48.
Forensic impact read

Major arterial upgrade connects South of Gurgaon directly to prime commercial hubs.

Ref ET/INFRA/92992883Verify filing ↗
News alerts

Get the latest, first.

Verified news on Adore Group, the moment it lands. No spam.

or

11 dispatches· tap the right of a card to advance, the left to go back · colour follows the report’s own rule — green sound, amber watch, rust risk.

06

Frequently asked

How many projects has Adore Group delivered in Gurugram?

We track 2 Adore Group projects in Gurugram: 0 delivered, 2 still under construction. Each is scored on delivery, legal standing and pricing in its own report.

Is Adore Group a reliable developer to buy from?

But reliability is project-specific: our developer read covers delivery, financial strength and legal signals, and every project Adore Group is building gets its own forensic report and Truth Score. Check the specific project before you book.

See all Adore Group projects

Every project we track from this developer — Truth Score, entry price and delivery risk, side by side.

Independent assessment by Truth Estate. No developer can pay for a higher score or a better placement. Performance figures are our own tracked estimates. For the full audited financials and project-level forensics, open the reports.